Toyota Camry (XV70): Installation
INSTALLATION
PROCEDURE
1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)
(a) Install the No. 1 vacuum switching valve assembly (for ACIS) to the intake air surge tank assembly with the bolt.
Torque:
9.0 N·m {92 kgf·cm, 80 in·lbf}
(b) Connect the 2 vacuum hose sub-assemblies to the No. 1 vacuum switching valve assembly (for ACIS).
(c) Connect the No. 1 vacuum switching valve assembly (for ACIS) connector.
2. INSTALL V-BANK COVER SUB-ASSEMBLY
Click here
READ NEXT:
ON-VEHICLE INSPECTION PROCEDURE
1. CHECK ENGINE OIL LEVEL (a) Warm up and stop the engine, then wait for 5 minutes.
(b) Check that the engine oil level is between the low level and full level mark
SEE MORE:
DESCRIPTION The fuel trim is related to the feedback compensation value, not to the basic injection duration. The fuel trim consists of both the short-term and long-term fuel trims.
The short-term fuel trim is fuel compensation that is used to constantly maintain the air fuel ratio at stoichiometr
■ Location of air outlets
The air outlets and air volume
change according to the
selected airflow mode.
■ Adjusting the position of and opening and closing the air outlets
Direct air flow to the left or
right, up or down.
Turn the knob to open or
close the vent.
■For quick