Toyota Camry (XV70): Installation
INSTALLATION
PROCEDURE
1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)
(a) Install the No. 1 vacuum switching valve assembly (for ACIS) to the intake air surge tank assembly with the bolt.
Torque:
9.0 N·m {92 kgf·cm, 80 in·lbf}
(b) Connect the 2 vacuum hose sub-assemblies to the No. 1 vacuum switching valve assembly (for ACIS).
(c) Connect the No. 1 vacuum switching valve assembly (for ACIS) connector.
2. INSTALL V-BANK COVER SUB-ASSEMBLY
Click here
READ NEXT:
ON-VEHICLE INSPECTION PROCEDURE
1. CHECK ENGINE OIL LEVEL (a) Warm up and stop the engine, then wait for 5 minutes.
(b) Check that the engine oil level is between the low level and full level mark
SEE MORE:
DATA LIST / ACTIVE TEST DATA LIST NOTICE:
In the table below, the values listed under "Normal Condition" are reference values. Do not depend solely on these reference values when deciding whether a part is faulty or not.
HINT: Using the Techstream to read the Data List allows the values or state
CAUTION / NOTICE / HINT HINT: *: Use the Techstream. PROCEDURE
1.
VEHICLE BROUGHT TO WORKSHOP
NEXT
2.
CUSTOMER PROBLEM ANALYSIS (a) Interview the customer and confirm the problem.
Click here
NEXT
3.