Toyota Camry (XV70): Installation
INSTALLATION
PROCEDURE
1. INSTALL GENERATOR ASSEMBLY
(a) Install the generator assembly with the 2 bolts.
Torque:
43 N
READ NEXT:
PRECAUTION NOTICE FOR INITIALIZATION NOTICE:
When disconnecting the cable from the negative (-) battery terminal, initialize the following systems after the cable is reconnected.
System See
SEE MORE:
ComponentsCOMPONENTS ILLUSTRATION
*A except 2-Pod Caliper
*B for 2-Pod Caliper
*1 FRONT AXLE HUB BOLT
*2 FRONT DISC
*3 FRONT DISC BRAKE CALIPER ASSEMBLY
*4 FRONT FLEXIBLE HOSE
Tightening torque for "Major areas involving basic ve
DESCRIPTION When the engine switch is turned on (IG), the battery voltage is applied to the IGSW terminal of the ECM.
The output signal from the MREL terminal of the ECM causes a current to flow to the coil of the EFI-MAIN NO. 1 relay, closing the contacts and supplying power to terminals +B and +