Toyota Camry (XV70): Installation
INSTALLATION
PROCEDURE
1. INSTALL TRANSFER ASSEMBLY
| (a) Using SST and a 17 mm union nut wrench, install the transfer assembly to the automatic transaxle assembly with the 8 nuts.
SST: 09961-00950 Torque: Specified tightening torque :
68.6 N |
READ NEXT:
COMPONENTS ILLUSTRATION
*1 TRANSFER AND TRANSAXLE SETTING STUD BOLT
*2 TRANSFER CASE OIL SEAL
N*m (kgf*cm, ft.*lbf): Specified torque
● Non-reusable pa
REPLACEMENT CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced durin
SEE MORE:
INSPECTION PROCEDURE 1. INSPECT NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY
(a) Turn the roller by hand to check that it turns smoothly. HINT:
If the roller does not turn smoothly, replace the No. 1 valve rocker arm sub-assembly.
2. INSPECT VALVE LASH ADJUSTER ASSEMBLY
NOTICE
INITIALIZATION RESET TRANSAXLE COMPENSATION CODE
NOTICE:
If the following parts have been replaced, initialize the ECM, perform Reset Memory and Perform Road Test to Allow ECM to Learn.
ECM (When transaxle compensation code cannot be transferred.)
Transmission valve body assembly