Toyota Camry owners & service manuals

Toyota Camry (XV70): Installation

INSTALLATION

PROCEDURE

1. INSTALL TRANSFER ASSEMBLY

(a) Using SST and a 17 mm union nut wrench, install the transfer assembly to the automatic transaxle assembly with the 8 nuts.

SST: 09961-00950

Torque:

Specified tightening torque :

68.6 N

    READ NEXT:

     Transfer Case Front Oil Seal (for Lh Side)

     Components

    COMPONENTS ILLUSTRATION *1 TRANSFER AND TRANSAXLE SETTING STUD BOLT *2 TRANSFER CASE OIL SEAL N*m (kgf*cm, ft.*lbf): Specified torque ● Non-reusable pa

     Replacement

    REPLACEMENT CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced durin

    SEE MORE:

     Reassembly

    REASSEMBLY PROCEDURE 1. INSTALL INSTRUMENT PANEL CUSHION (a) Clean the instrument panel safety pad sub-assembly surface. (1) Remove any remaining double-sided tape from the instrument panel safety pad sub-assembly. (2) Wipe off any tape adhesive residue with cleaner. (b) Remove the release paper f

     Inspection

    INSPECTION PROCEDURE 1. INSPECT FUEL PUMP ASSEMBLY (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Condition 1 - 2 20°C (68°F) 0.45 to 0.55 Ω If the result is not

    © 2023-2026 Copyright www.tocamry.com