Toyota Camry (XV70): Installation
INSTALLATION
PROCEDURE
1. INSTALL TRANSFER ASSEMBLY
| (a) Using SST and a 17 mm union nut wrench, install the transfer assembly to the automatic transaxle assembly with the 8 nuts.
SST: 09961-00950 Torque: Specified tightening torque :
68.6 N |
READ NEXT:
COMPONENTS ILLUSTRATION
*1 TRANSFER AND TRANSAXLE SETTING STUD BOLT
*2 TRANSFER CASE OIL SEAL
N*m (kgf*cm, ft.*lbf): Specified torque
● Non-reusable pa
REPLACEMENT CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced durin
SEE MORE:
INSPECTION PROCEDURE 1. INSPECT FLOW SHUTTING VALVE (NO. 1 WATER BY-PASS HOSE)
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection Condition
Specified Condition
1 - 2 20°C (68°F)
22 to 28 Ω
DESCRIPTION The main body ECU (multiplex network body ECU) determines the status of the automatic high beam system based on the automatic high beam system signal from the forward recognition camera.
DTC No. Detection Item
DTC Detection Condition
Trouble Area DTC Output from