Toyota Camry (XV70): Installation
INSTALLATION
PROCEDURE
1. INSTALL TRANSFER ASSEMBLY
| (a) Using SST and a 17 mm union nut wrench, install the transfer assembly to the automatic transaxle assembly with the 8 nuts.
SST: 09961-00950 Torque: Specified tightening torque :
68.6 N |
READ NEXT:
COMPONENTS ILLUSTRATION
*1 TRANSFER AND TRANSAXLE SETTING STUD BOLT
*2 TRANSFER CASE OIL SEAL
N*m (kgf*cm, ft.*lbf): Specified torque
● Non-reusable pa
REPLACEMENT CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced durin
SEE MORE:
REMOVAL PROCEDURE 1. REMOVE FRONT WHEEL RH
Click here 2. REMOVE FRONT FENDER APRON SEAL RH
Click here
3. REMOVE V-BANK COVER SUB-ASSEMBLY Click here
4. REMOVE CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY (for Intake Side of Bank 1)
Click here 5. SET NO. 1 CYLINDER
DISASSEMBLY CAUTION / NOTICE / HINT
NOTICE:
Do not disconnect the tube shown in the illustration when disassembling the fuel suction tube with pump and gauge assembly. Doing so will cause reassembly of the fuel suction tube with pump and gauge assembly to be impossible as the tube is pressed i