Toyota Camry (XV70): Installation
INSTALLATION
PROCEDURE
1. INSTALL TRANSFER ASSEMBLY
| (a) Using SST and a 17 mm union nut wrench, install the transfer assembly to the automatic transaxle assembly with the 8 nuts.
SST: 09961-00950 Torque: Specified tightening torque :
68.6 N |
READ NEXT:
COMPONENTS ILLUSTRATION
*1 TRANSFER AND TRANSAXLE SETTING STUD BOLT
*2 TRANSFER CASE OIL SEAL
N*m (kgf*cm, ft.*lbf): Specified torque
● Non-reusable pa
REPLACEMENT CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced durin
SEE MORE:
ON-VEHICLE INSPECTION PROCEDURE
1. FUEL PUMP ASSEMBLY OPERATION (a) Check fuel pressure. (1) Connect the Techstream to the DLC3.
(2) Start the engine. (3) Turn the Techstream on. (4) Enter the following menus: Powertrain / Engine / Active Test / Control the Target Fuel Pressure Offset. Powertrai
CAUTION / NOTICE / HINT HINT: *: Use the Techstream. PROCEDURE
1.
VEHICLE BROUGHT TO WORKSHOP
NEXT
2.
CUSTOMER PROBLEM ANALYSIS (a) Interview the customer and confirm the problem.
Click here
NEXT
3.