Toyota Camry (XV70): Transfer Assembly
READ NEXT:
COMPONENTS ILLUSTRATION
*1 PROPELLER SHAFT HEAT INSULATOR
*2 NO. 1 PROPELLER SHAFT HEAT INSULATOR BRACKET SUB-ASSEMBLY
*3 REAR ENGINE MOUNTING BRACKET SUB-ASSEMBLY
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during tr
DISASSEMBLY CAUTION / NOTICE / HINT
NOTICE: Before installation of each part, thoroughly clean and dry it. Then apply grease or oil as necessary. Do not use alkaline chemicals to clean aluminum part
SEE MORE:
INSPECTION PROCEDURE 1. INSPECT FUEL INJECTOR ASSEMBLY
(a) Check the resistance.
(1) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection Condition
Specified Condition 1 - 2
20°C (68°F) 11.6 to 12.4 ]
REASSEMBLY PROCEDURE 1. INSTALL OIL PUMP ROTOR SET
(a) Coat the drive rotor and driven rotor with engine oil and place them into the timing chain cover assembly with the rotor marks facing up. Check that the rotors rotate smoothly.
*a Rotor Mark
2. I