Toyota Camry (XV70): Transfer Assembly
READ NEXT:
COMPONENTS ILLUSTRATION
*1 PROPELLER SHAFT HEAT INSULATOR
*2 NO. 1 PROPELLER SHAFT HEAT INSULATOR BRACKET SUB-ASSEMBLY
*3 REAR ENGINE MOUNTING BRACKET SUB-ASSEMBLY
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during tr
DISASSEMBLY CAUTION / NOTICE / HINT
NOTICE: Before installation of each part, thoroughly clean and dry it. Then apply grease or oil as necessary. Do not use alkaline chemicals to clean aluminum part
SEE MORE:
PROCEDURE
1. CHECK NOISE CONDITION
(a) Check from which direction the noise comes (front left or right, or rear left or right).
OK: The location of the noise source can be determined.
NG
GO TO STEP 3
OK
2.
CHECK SPEAKERS (a
DISASSEMBLY PROCEDURE 1. REMOVE COOLER DRYER
(a) Using a 14 mm straight hexagon, remove the cap from the modulator.
*a Modulator
(b) Using pliers, remove the cooler dryer from the modulator.
*a Modulator