Toyota Camry owners & service manuals

Toyota Camry (XV70): Installation

INSTALLATION

PROCEDURE

1. INSTALL FUEL MAIN VALVE ASSEMBLY

(a) Apply gasoline to 2 new O-rings. Then install the O-rings to the fuel main valve assembly (for Low Pressure).

(b) Apply gasoline to 2 new O-rings. Then install the O-rings to the fuel main valve assembly (for High Pressure).

(c) Install the 2 fuel main valve assemblies to the fuel filter.

*1

Fuel Main Valve Assembly (for Low Pressure)

*2

Fuel Main Valve Assembly (for High Pressure)

*a

Identification Mark (Part Number)

-

-

NOTICE:

  • Make sure that the O-rings are not cut or pinched during installation.
  • The fuel main valve assembly (for Low Pressure) and fuel main valve assembly (for High Pressure) have identification marks (part numbers). If the parts are installed in the incorrect positions, the engine may stall. Therefore, make sure to install the parts in the correct positions.

A

Fuel Main Valve Assembly (for Low Pressure)

23070-31***

B

Fuel Main Valve Assembly (for High Pressure)

23070-36***

(d) Install the 2 clips to the fuel filter.

2. INSTALL FUEL PUMP

Click here

3. INSTALL FUEL SENDER GAUGE ASSEMBLY

Click here

4. INSTALL FUEL SUCTION TUBE WITH PUMP AND GAUGE ASSEMBLY

Click here

    READ NEXT:

     Fuel Pressure Sensor

     Components

    COMPONENTS ILLUSTRATION *1 FUEL PRESSURE SENSOR (FUEL DELIVERY PIPE WITH SENSOR ASSEMBLY) - -

     Removal

    REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during fu

    SEE MORE:

     Installation

    INSTALLATION PROCEDURE 1. INSTALL STARTER ASSEMBLY (a) Install the starter assembly with the 2 bolts. Torque: 46 N·m {469 kgf·cm, 34 ft·lbf} (b) Connect the engine wire to the terminal 30 with the nut. Torque: 9.8 N·m {100 kgf·cm, 87 in·lbf} (c) Close the terminal cap. (d) Connect the

     How To Proceed With Troubleshooting

    CAUTION / NOTICE / HINT HINT: *: Use the Techstream. PROCEDURE 1. VEHICLE BROUGHT TO WORKSHOP NEXT 2. CUSTOMER PROBLEM ANALYSIS (a) Interview the customer and confirm the problem. Click here NEXT 3.

    © 2023-2025 Copyright www.tocamry.com