INSTALLATION
PROCEDURE
1. INSTALL COMBINATION METER ASSEMBLY
(a) Connect each connector.
(b) Engage the clamp.
(c) Engage the 2 clips as shown in the illustration.
|
Install in this Direction |
(d) Install the combination meter assembly with the 3 screws.
2. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY
(a) Connect the connector.
(b) Engage the 2 guides and 4 clips as shown in the illustration.
|
Install in this Direction |
(c) Install the 2 clips.
(d) Engage the 4 clips and 2 claws to install the instrument cluster finish panel assembly.
|
Install in this Direction |
3. INSTALL NO. 2 METER HOOD CLUSTER
Click here
4. INSTALL NO. 1 METER HOOD CLUSTER
Click here
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
for A25A-FKS:
Click here
for 2GR-FKS:
Click here
Removal
Distance Control Switch Circuit