COMPONENTS

ILLUSTRATION

*1

FRONT WHEEL OPENING EXTENSION PAD RH

*2

FRONT WHEEL OPENING EXTENSION PAD LH

*3

NO. 1 ENGINE UNDER COVER

*4

NO. 2 ENGINE UNDER COVER ASSEMBLY

N*m (kgf*cm, ft.*lbf): Specified torque

-

-

ILLUSTRATION

*1

TRANSFER FILLER PLUG

*2

TRANSFER DRAIN PLUG

*3

GASKET

-

-

Tightening torque for "Major areas involving basic vehicle performance such as moving/turning/stopping": N*m (kgf*cm, ft.*lbf)

*

For use with SST and a union nut wrench

Non-reusable part

-

-

    READ NEXT:

     On-vehicle Inspection

    ON-VEHICLE INSPECTION PROCEDURE 1. REMOVE FRONT WHEEL OPENING EXTENSION PAD RH Click here 2. REMOVE FRONT WHEEL OPENING EXTENSION PAD LH Click here 3. REMOVE NO. 1 ENGINE UNDER COV

     Replacement

    REPLACEMENT PROCEDURE 1. REMOVE FRONT WHEEL OPENING EXTENSION PAD RH Click here 2. REMOVE FRONT WHEEL OPENING EXTENSION PAD LH Click here 3. REMOVE NO. 1 ENGINE UNDER COVER Click h

     Transfer System

    PrecautionPRECAUTION PRECAUTION (a) Before disassembling the transfer assembly, thoroughly clean it to remove any foreign matter. This will help prevent contamination inside the transfer during disa

    SEE MORE:

     Installation

    INSTALLATION CAUTION / NOTICE / HINT HINT: Use the same procedure for the RH side and LH side. The following procedure is for the LH side. PROCEDURE 1. TEMPORARILY INSTALL REAR AXLE CARRIER SUB-ASSEMBLY (a) Temporarily install the rear axle carrier sub-assembly to the rear shock abso

     Removal

    REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during fuel tank assembly removal/installation are shown below. Necessary Procedures After Parts Removed/Inst