Toyota Camry (XV70): Installation
INSTALLATION
PROCEDURE
1. INSTALL REAR DIFFERENTIAL SUPPORT
(a) Install the rear differential support to the rear differential carrier assembly with 4 new bolts.
Torque:
72 N
READ NEXT:
COMPONENTS ILLUSTRATION
*1 REAR DIFFERENTIAL CARRIER ASSEMBLY
*2 REAR NO. 1 DIFFERENTIAL SUPPORT
*3 REAR NO. 2 DIFFERENTIAL SUPPORT
- -
Tightening
REPLACEMENT CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced duri
SEE MORE:
INSTALLATION PROCEDURE 1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)
(a) Install the No. 1 vacuum switching valve assembly (for ACIS) to the intake air surge tank assembly with the bolt.
Torque: 9.0 N·m {92 kgf·cm, 80 in·lbf} (b) Connect the 2 vacuum hose sub-assemblies to the
COMPONENTS ILLUSTRATION
*1 FRONT CENTER UPPER SUSPENSION BRACE SUB-ASSEMBLY
- -
Tightening torque for "Major areas involving basic vehicle performance such as moving/turning/stopping": N*m (kgf*cm, ft.*lbf)
N*m (kgf*cm, ft.*lbf): Specified torque IL