Toyota Camry owners & service manuals

Toyota Camry (XV70): Terminals Of Ecu

TERMINALS OF ECU

CHECK SLIDING ROOF ECU (SLIDING ROOF DRIVE GEAR SUB-ASSEMBLY)

(a) Disconnect the V2 sliding roof ECU (sliding roof drive gear sub-assembly) connector.

(b) Measure the resistance and voltage according to the value(s) in the table below.

HINT:

Measure the values on the wire harness side with the connector disconnected.

Terminal No. (Symbol)

Wiring Color

Terminal Description

Condition

Specified Condition

V2-1 (B) - V2-2 (E)

B - W-B

Battery power supply

Always

11 to 14 V

V2-6 (IG) - V2-2 (E)

LA-GR - W-B

IG power supply

Ignition switch off

Below 1 V

V2-6 (IG) - V2-2 (E)

LA-GR - W-B

IG power supply

Ignition switch ON

11 to 14 V

V2-2 (E) - Body ground

W-B - Body ground

Ground

Always

Below 1 Ω

(c) Reconnect the V2 sliding roof ECU (sliding roof drive gear sub-assembly) connector.

(d) Measure the voltage according to the value(s) in the table below.

Terminal No. (Symbol)

Wiring Color

Terminal Description

Condition

Specified Condition

V2-10 (OPN) - V2-2 (E)

W - W-B

Sliding roof motor open

Ignition switch ON, OPEN switch on

Below 1 V

V2-10 (OPN) - V2-2 (E)

W - W-B

Sliding roof motor open

Ignition switch ON, OPEN switch off

11 to 14 V

V2-8 (CLS) - V2-2 (E)

SB - W-B

Sliding roof motor close

Ignition switch ON, CLOSE switch on

Below 1 V

V2-8 (CLS) - V2-2 (E)

SB - W-B

Sliding roof motor close

Ignition switch ON, CLOSE switch off

11 to 14 V

V2-5 (OPN) - V2-2 (E)

R - W-B

Sliding roof motor up

Ignition switch ON, UP switch on

Below 1 V

V2-5 (OPN) - V2-2 (E)

R - W-B

Sliding roof motor up

Ignition switch ON, UP switch off

11 to 14 V

V2-9 (CLS) - V2-2 (E)

LG - W-B

Sliding roof motor down

Ignition switch ON, DOWN switch on

Below 1 V

V2-9 (CLS) - V2-2 (E)

LG - W-B

Sliding roof motor down

Ignition switch ON, DOWN switch off

11 to 14 V

CHECK MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU)

Click here

    READ NEXT:

    SEE MORE:

     Installation

    INSTALLATION PROCEDURE 1. SET NO. 1 CYLINDER TO TDC (COMPRESSION) (a) Confirm that the timing mark (cutout) on the crankshaft pulley is aligned with the "0" timing mark of the timing chain cover assembly. *a Timing Mark (Cutout) *b "0" Timing Mark

     Check Bus 2 Line for Short to GND

    DESCRIPTION There may be a short circuit between one of the CAN bus lines and GND when there is no resistance between terminal 18 (CA4H) of the central gateway ECU (network gateway ECU) and terminal 4 (CG) of the DLC3, or terminal 17 (CA4L) of the central gateway ECU (network gateway ECU) and termin

    © 2023-2026 Copyright www.tocamry.com