Toyota Camry (XV70): Transmission Wire
READ NEXT:
COMPONENTS ILLUSTRATION
*1 REAR ENGINE UNDER COVER LH
*2 FRONT FENDER APRON SEAL LH
*3 NO. 1 ENGINE UNDER COVER
*4 FRONT WHEEL OPENING EXTENSION PAD LH
*5
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during t
INSTALLATION PROCEDURE 1. INSTALL TRANSMISSION WIRE
(a) Coat the O-ring of the transmission wire with Toyota Genuine ATF WS.
(b) Install the transmission wire to the automat
SEE MORE:
REASSEMBLY PROCEDURE 1. INSTALL GENERATOR DRIVE END FRAME BEARING
(a) Using SST and a press, install a new generator drive end frame bearing to the generator drive end frame.
SST: 09950-60010 09951-00470 SST: 09950-70010 09951-07100
(b) Fit the tabs of the retainer
INSPECTION PROCEDURE 1. INSPECT STEERING HEATER SWITCH
(a) Remove the steering heater switch. Click here
*a Component without harness connected
(Steering Heater Switch)
(b) Measure the resistance according to the value(s) in the table