Toyota Camry (XV70): Ecm
READ NEXT:
COMPONENTS ILLUSTRATION
*1 AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE
*2 COOL AIR INTAKE DUCT SEAL
*3 ECM
*4 INLET AIR CLEANER ASSEMBLY
*5 NO. 1 ECM BRA
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during EC
INSTALLATION PROCEDURE 1. INSTALL NO. 2 ECM BRACKET
(a) Install the No. 2 ECM bracket to the ECM with the 2 screws. Torque:
4.5 N·m {46 kgf·cm, 40 in·lbf} 2. INSTALL NO. 1 ECM BRACKET (a) Inst
SEE MORE:
INSTALLATION PROCEDURE 1. INSTALL TAIL EXHAUST PIPE BAFFLE SUB-ASSEMBLY
HINT:
Perform this procedure only when replacement of the tail exhaust pipe baffle sub-assembly is necessary.
If the tail exhaust pipe baffle sub-assembly is removed, replace it with a new one.
(a) Type A (w/ Tai
INSPECTION PROCEDURE 1. INSPECT OIL PUMP RELIEF VALVE
(a) Coat the oil pump relief valve with engine oil and check that it falls smoothly into the valve hole by its own weight.
HINT: If the oil pump relief valve does not fall smoothly, replace the timing chain cover assembly.