Toyota Camry owners & service manuals

Toyota Camry (XV70): Inspection

INSPECTION

PROCEDURE

1. INSPECT CAMSHAFT TIMING GEAR BOLT

(a) Check the stroke of the plunger in the center of the camshaft timing gear bolt.

Standard Stroke:

4.5 mm (0.177 in.) or more

HINT:

When pressing the plunger, there may be a stepped feeling. This is not a malfunction.

If the result is not as specified, replace the camshaft timing gear bolt.

*a

Plunger

    READ NEXT:

     Installation

    INSTALLATION PROCEDURE 1. INSTALL CAMSHAFT TIMING GEAR BOLT (a) Make sure that the No. 1 cylinder is at TDC/compression. HINT: Check that the cutout of the camshaft timing gear assembly is at the

     Camshaft Oil Control Valve (for Intake Side Of Bank 2)

     Components

    COMPONENTS ILLUSTRATION *1 CAMSHAFT TIMING GEAR BOLT *2 O-RING *3 CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY (for Intake Side of Bank 2) - - N*m

    SEE MORE:

     Precaution

    PRECAUTION PRECAUTION FOR DISCONNECTING CABLE FROM NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable from the negative (-) battery terminal, initialize the following system(s) after the cable is reconnected: System See Procedure Lane Tracing Assist System

     Components

    COMPONENTS ILLUSTRATION *1 REAR ENGINE OIL SEAL *2 NO. 1 CRANKSHAFT POSITION SENSOR PLATE *3 DRIVE PLATE AND RING GEAR SUB-ASSEMBLY *4 REAR DRIVE PLATE SPACER N*m (kgf*cm, ft.*lbf): Specified torque ● Non-reusable part

    © 2023-2025 Copyright www.tocamry.com