Toyota Camry (XV70): Camshaft Oil Control Valve (for Intake Side Of Bank 2)
READ NEXT:
COMPONENTS ILLUSTRATION
*1 CAMSHAFT TIMING GEAR BOLT
*2 O-RING
*3 CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY (for Intake Side of Bank 2)
- -
N*m
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during c
INSPECTION PROCEDURE 1. INSPECT CAMSHAFT TIMING GEAR BOLT
(a) Check the stroke of the plunger in the center of the camshaft timing gear bolt.
Standard Stroke: 4.5 mm (0.177 in.) or more HINT
SEE MORE:
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during fuel pump assembly removal/installation are shown below. Necessary Procedures After Parts Removed/Inst
INSTALLATION PROCEDURE 1. INSTALL VSC OFF SWITCH
(a) Engage the 2 claws to install the VSC OFF switch to the No. 1 instrument panel sub-assembly.
2. INSTALL NO. 1 INSTRUMENT PANEL SUB-ASSEMBLY Click here
3. CONNECT HOOD LOCK CONTROL LEVER SUB-ASSEMBLY
Click here
4. INSTALL NO.