Toyota Camry (XV70): Inspection
INSPECTION
PROCEDURE
1. INSPECT CAMSHAFT TIMING GEAR BOLT
| (a) Check the stroke of the plunger in the center of the camshaft timing gear bolt.
Standard Stroke: 4.5 mm (0.177 in.) or more HINT: When pressing the plunger, there may be a stepped feeling. This is not a malfunction.
If the result is not as specified, replace the camshaft timing gear bolt. |
|
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL CAMSHAFT TIMING GEAR BOLT
(a) Make sure that the No. 1 cylinder is at TDC/compression. HINT:
Check that the cutout of the camshaft timing gear assembly is at the
COMPONENTS ILLUSTRATION
*1 VVT SENSOR (for Intake Side of Bank 1)
*2 VVT SENSOR (for Exhaust Side of Bank 1)
*3 VVT SENSOR (for Intake Side of Bank 2)
*4 VVT SENS
SEE MORE:
REMOVAL CAUTION / NOTICE / HINT
HINT:
Use the same procedure for the RH side and LH side.
The following procedure is for the LH side.
PROCEDURE 1. REMOVE LUGGAGE COMPARTMENT DOOR COVER
Click here
2. REMOVE REAR LIGHT ASSEMBLY
(a) for Bulb Type Back-up Light:
(1)
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during brake master cylinder sub-assembly removal/installation are shown below. Necessary Procedures After Pa