Toyota Camry (XV70): Inspection
INSPECTION
PROCEDURE
1. INSPECT FLOW SHUTTING VALVE (NO. 1 WATER BY-PASS HOSE)
| (a) Measure the resistance according to the value(s) in the table below.
Standard Resistance: |
Tester Connection | Condition |
Specified Condition | |
1 - 2 | 20°C (68°F) |
22 to 28 Ω | If the result is not as specified, replace the flow shutting valve (No. 1 water by-pass hose). |
|
|
*a | Component without harness connected
(Flow Shutting Valve (No. 1 Water By-pass Hose)) | | |
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL FLOW SHUTTING VALVE (NO. 1 WATER BY-PASS HOSE)
(a) Install the flow shutting valve (No. 1 water by-pass hose) with the bolt.
Torque: 19 N·m {194 kgf·cm, 14 ftÂ
COMPONENTS ILLUSTRATION
*A for TMC made
- -
*1 NO. 1 ENGINE UNDER COVER
*2 NO. 2 ENGINE UNDER COVER ASSEMBLY
*3 FRONT WHEEL OPENING EXTENSION PAD LH
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during fl
SEE MORE:
COMPONENTS ILLUSTRATION
*1 STEERING WHEEL ASSEMBLY
*2 STEERING PAD SWITCH ASSEMBLY
*3 SHIFT PADDLE SWITCH (TRANSMISSION SHIFT SWITCH ASSEMBLY)
*4 NO. 1 SWITCH WIRE
N*m (kgf*cm, ft.*lbf): Specified torque
● Non-reusable part
&
INSPECTION PROCEDURE 1. INSPECT ENGINE OIL PRESSURE SWITCH ASSEMBLY
(a) Disengage the clamp to disconnect the wire harness protector.
*1 Wire Harness Protector
(b) Disconnect the engine oil pressure switch assembly connector. (c) Start the engine.