Toyota Camry (XV70): Inspection
INSPECTION
PROCEDURE
1. INSPECT FLOW SHUTTING VALVE (NO. 1 WATER BY-PASS HOSE)
| (a) Measure the resistance according to the value(s) in the table below.
Standard Resistance: |
Tester Connection | Condition |
Specified Condition | |
1 - 2 | 20°C (68°F) |
22 to 28 Ω | If the result is not as specified, replace the flow shutting valve (No. 1 water by-pass hose). |
|
|
*a | Component without harness connected
(Flow Shutting Valve (No. 1 Water By-pass Hose)) | | |
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL FLOW SHUTTING VALVE (NO. 1 WATER BY-PASS HOSE)
(a) Install the flow shutting valve (No. 1 water by-pass hose) with the bolt.
Torque: 19 N·m {194 kgf·cm, 14 ftÂ
COMPONENTS ILLUSTRATION
*A for TMC made
- -
*1 NO. 1 ENGINE UNDER COVER
*2 NO. 2 ENGINE UNDER COVER ASSEMBLY
*3 FRONT WHEEL OPENING EXTENSION PAD LH
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during fl
SEE MORE:
COMPONENTS ILLUSTRATION
*1 FRONT WHEEL OPENING EXTENSION PAD RH
*2 FRONT WHEEL OPENING EXTENSION PAD LH
*3 NO. 1 ENGINE UNDER COVER
*4 NO. 2 ENGINE UNDER COVER ASSEMBLY
N*m (kgf*cm, ft.*lbf): Specified torque
- - ILLUSTRATION
VEHICLE CONTROL HISTORY CHECK VEHICLE CONTROL HISTORY
HINT:
The vehicle control history data stores the history of the reject function and system protection operations.
The number of occurrences, date and distance are stored in batches for each item.
(a) Connect the Techstream