Toyota Camry owners & service manuals

Toyota Camry (XV70): Installation

INSTALLATION

PROCEDURE

1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)

(a) Install the No. 1 vacuum switching valve assembly (for ACIS) to the intake air surge tank assembly with the bolt.

Torque:

9.0 N·m {92 kgf·cm, 80 in·lbf}

(b) Connect the 2 vacuum hose sub-assemblies to the No. 1 vacuum switching valve assembly (for ACIS).

(c) Connect the No. 1 vacuum switching valve assembly (for ACIS) connector.

2. INSTALL V-BANK COVER SUB-ASSEMBLY

Click here

    READ NEXT:

     Components

    COMPONENTS ILLUSTRATION *1 NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (for ACIS) *2 VACUUM HOSE SUB-ASSEMBLY *3 V-BANK COVER SUB-ASSEMBLY - - N*m (kgf*c

     Removal

    REMOVAL PROCEDURE 1. REMOVE V-BANK COVER SUB-ASSEMBLY Click here 2. REMOVE NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (for ACIS) (a) Disconnect the No. 1 vacuum switching valve assembly

     Inspection

    INSPECTION PROCEDURE 1. INSPECT NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (for ACIS) (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester C

    SEE MORE:

     Problem Symptoms Table

    PROBLEM SYMPTOMS TABLE NOTICE: Depending on the parts that are replaced during vehicle inspection or maintenance, performing initialization, registration or calibration may be needed. Refer to Precaution for Navigation System. Click here When replacing the radio and display receiver asse

     Removal

    REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during fuel pump removal/installation are shown below. Necessary Procedures After Parts Removed/Installed/Rep