Toyota Camry owners & service manuals

Toyota Camry (XV70): Installation

INSTALLATION

CAUTION / NOTICE / HINT

NOTICE:

This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.

Click here

PROCEDURE

1. INSTALL WATER INLET WITH THERMOSTAT SUB-ASSEMBLY

(a) Install a new gasket to the water inlet with thermostat sub-assembly.

HINT:

Be sure to clean the contact surfaces.

(b) Using an 8 mm socket wrench, install the water inlet with thermostat sub-assembly with the 2 bolts.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

(c) Connect the No. 7 water by-pass hose to the water inlet with thermostat sub-assembly and slide the clip to secure it.

(d) Connect the water inlet with thermostat sub-assembly connector.

2. CONNECT NO. 2 RADIATOR HOSE

Click here

3. INSTALL GENERATOR ASSEMBLY

Click here

4. ADD ENGINE COOLANT

Click here

5. INSPECT FOR COOLANT LEAK

Click here

    READ NEXT:

     Water Pump

    ComponentsCOMPONENTS ILLUSTRATION *1 ENGINE WATER PUMP ASSEMBLY (WATER INLET HOUSING) *2 GASKET N*m (kgf*cm, ft.*lbf): Specified torque ● Non-reusable

     Cruise Control

     Camera Heater

    ComponentsCOMPONENTS ILLUSTRATION *1 FORWARD RECOGNITION CAMERA *2 FORWARD RECOGNITION WITH HEATER HOOD SUB-ASSEMBLY RemovalREMOVAL PROCEDURE 1. REMOVE FORWARD RECOGNITION CAM

    SEE MORE:

     Charging Failure

    PROCEDURE 1. CHECK GENERATOR PULLEY WITH CLUTCH (ON-VEHICLE INSPECTION) (a) Start the engine and visually check that the generator rotor assembly (fan) in the generator assembly is operating. OK: The generator rotor assembly (fan) is operating. NG REPLACE GENERATOR PULLE

     Installation

    INSTALLATION PROCEDURE 1. INSTALL TIMING CHAIN COVER ASSEMBLY (a) Clean the contact surfaces of the engine assembly, and confirm that no oil, moisture, or other foreign matter is on the surfaces. *a Engine Assembly Side *b Timing Chain Cover Assembly Side Clean

    © 2023-2026 Copyright www.tocamry.com