Toyota Camry (XV70): Reassembly
REASSEMBLY
CAUTION / NOTICE / HINT
HINT:
- Use the same procedure for the LH side and RH side.
- The following procedure is for the LH side.
PROCEDURE
1. INSTALL PARKING BRAKE SHOE HOLD DOWN SPRING PIN (for Rear Side)
(a) Install the parking brake shoe hold down spring pin to the backing plate.
| (b) Temporarily install the backing plate to the rear axle carrier sub-assembly with the nut.
NOTICE: Do not twist the No. 3 parking brake cable assembly when installing the backing plate.
HINT: Fully tighten the nut after installing the rear axle hub and bearing assembly. |
|
| (c) Install the rear axle hub and bearing assembly to the rear axle carrier sub-assembly with the 4 bolts.
Torque: 90 N |
READ NEXT:
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during N
INSTALLATION PROCEDURE 1. INSTALL NO. 1 PARKING BRAKE CABLE ASSEMBLY
(a) Install the No. 1 parking brake cable assembly with the 3 bolts and nut.
Torque: Bolt: : 15.5 N
SEE MORE:
COMPONENTS ILLUSTRATION
*1 FUEL DELIVERY PIPE WITH SENSOR ASSEMBLY
*2 FUEL INJECTOR ASSEMBLY
*3 FUEL TUBE SUB-ASSEMBLY
*4 INJECTOR VIBRATION INSULATOR
*5 NO. 1 DELIVERY PIPE SPACER
*6 NO. 5 ENGINE WIRE (for Bank 1)
*7 NO. 5 ENGINE WIR
COMPONENTS ILLUSTRATION
*1 ENGINE WIRE
*2 NO. 1 VACUUM HOSE CONNECTOR
*3 VACUUM PUMP ASSEMBLY
*4 NO. 1 VACUUM PUMP O-RING
Tightening torque for "Major areas involving basic vehicle performance such as moving/turning/stopping": N*m (kgf*cm, ft.*lbf