Toyota Camry (XV70): 2gr-fks Battery
READ NEXT:
COMPONENTS ILLUSTRATION
*1 BATTERY
*2 NEGATIVE BATTERY TERMINAL
*3 POSITIVE BATTERY TERMINAL
*4 NO. 2 BATTERY CLAMP
*5 BATTERY TERMINAL CAP
- -
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced battery r
INSTALLATION PROCEDURE 1. INSTALL BATTERY
(a) Install the battery to the vehicle.
(b) Install the No. 2 battery clamp to the battery clamp sub-assembly with the bolt.
Torque: 18.5 N
SEE MORE:
DESCRIPTION When the shift lever is in S and moved toward "-" or "+", it is possible to select different shift ranges (S1 to S8).
Moving the shift lever toward "+" increases the shift range by one, and moving the shift lever toward "-" decreases the shift range by one. WIRING DIAGRAM
CAUTION /
DESCRIPTION There may be a short circuit between the CAN main bus lines and/or CAN branch lines when the resistance between terminals 15 (CA5H) and 16 (CA5L) of the central gateway ECU (network gateway ECU) is below 54 Ω.
Symptom Trouble Area
Resistance between terminals 15 (CA5