Toyota Camry owners & service manuals

Toyota Camry (XV70): Inspection

INSPECTION

PROCEDURE

1. INSPECT FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY)

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

1 - 2

20°C (68°F)

22 to 28 Ω

If the result is not as specified, replace the flow shutting valve (water by-pass hose assembly).

*a

Component without harness connected

(Flow Shutting Valve (Water By-pass Hose Assembly))

    READ NEXT:

     Installation

    INSTALLATION PROCEDURE 1. INSTALL FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY) (a) Connect the flow shutting valve (water by-pass hose assembly) to the transmission oil cooler and slide the cli

     Radiator

     Components

    COMPONENTS ILLUSTRATION *1 FRONT WHEEL OPENING EXTENSION PAD LH *2 FRONT WHEEL OPENING EXTENSION PAD RH *3 NO. 1 ENGINE UNDER COVER *4 NO. 2 ENGINE UNDER COVER AS

    SEE MORE:

     Front Disc Brake Pad

    ComponentsCOMPONENTS ILLUSTRATION *1 FRONT DISC BRAKE ANTI-SQUEAL SHIM KIT *2 FRONT DISC BRAKE PAD *3 FRONT DISC BRAKE CYLINDER ASSEMBLY *4 FRONT DISC BRAKE PAD WEAR INDICATOR PLATE *5 FRONT NO. 1 DISC BRAKE ANTI-SQUEAL SHIM *6 FRONT NO. 2 DISC

     Installation

    INSTALLATION PROCEDURE 1. INSTALL NO. 1 FUEL TANK CUSHION (a) Install 2 new No. 1 fuel tank cushions to the fuel tank assembly. 2. INSTALL NO. 6 FUEL TANK CUSHION (a) Install a new No. 6 fuel tank cushion to the fuel tank assembly. 3. INSTALL FUEL TANK MAIN TUBE SUB-ASSEMBLY (a) Engage the cla

    © 2023-2026 Copyright www.tocamry.com