Toyota Camry (XV70): Flow Shutting Valve(for Heater)
READ NEXT:
COMPONENTS ILLUSTRATION
*1 FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY)
*2 VACUUM HOSE
*3 ENGINE WIRE HARNESS
*4 OUTLET HEATER HOSE
*5 INLET HEATER
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during fl
INSPECTION PROCEDURE 1. INSPECT FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY)
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester
SEE MORE:
PrecautionPRECAUTION
NOTICE:
Do not apply or add any oil or grease to the belt tensioner to prevent abnormal noises from the belt tensioner pulley, belt squealing, etc.
Do not allow oil or grease to adhere to the moving parts of the belt tensioner, as this may cause malfunctions.
INSTALLATION PROCEDURE 1. INSTALL NO. 1 FUEL TANK CUSHION
(a) Install 2 new No. 1 fuel tank cushions to the fuel tank assembly. 2. INSTALL NO. 6 FUEL TANK CUSHION
(a) Install a new No. 6 fuel tank cushion to the fuel tank assembly. 3. INSTALL FUEL TANK MAIN TUBE SUB-ASSEMBLY
(a) Engage the cla