Toyota Camry (XV70): Installation
INSTALLATION
PROCEDURE
1. INSTALL TRANSMISSION OIL COOLER
| (a) Temporarily install the transmission oil cooler to the automatic transaxle case sub-assembly with the bolt (A). |
|
(b) Install the bolt (B).
Torque:
13.5 N
READ NEXT:
COMPONENTS ILLUSTRATION
*1 CLUTCH DRUM OIL SEAL RING
*2 FRONT OIL PUMP BODY
*3 FRONT OIL PUMP DRIVE GEAR
*4 FRONT OIL PUMP DRIVEN GEAR
*5 OIL STRAINER A
DISASSEMBLY PROCEDURE 1. REMOVE CLUTCH DRUM OIL SEAL RING
(a) Remove the 4 clutch drum oil seal rings from the stator shaft assembly.
2. REMOVE OIL STRAINER ASSEMBLY
(
SEE MORE:
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during brake booster assembly removal/installation are shown below. Necessary Procedures After Parts Removed/
Take notice of the following information about storage precautions,
cargo capacity and load:
Capacity and distribution
Cargo capacity depends on the total weight of the occupants.
(Cargo capacity) = (Total load capacity) - (Total weight of occupants)
Steps for Determining Correct Load Limit -