Toyota Camry owners & service manuals

Toyota Camry (XV70): Installation

INSTALLATION

PROCEDURE

1. INSTALL TRANSMISSION OIL COOLER

(a) Temporarily install the transmission oil cooler to the automatic transaxle case sub-assembly with the bolt (A).

(b) Install the bolt (B).

Torque:

13.5 N

    READ NEXT:

     Oil Pump

     Components

    COMPONENTS ILLUSTRATION *1 CLUTCH DRUM OIL SEAL RING *2 FRONT OIL PUMP BODY *3 FRONT OIL PUMP DRIVE GEAR *4 FRONT OIL PUMP DRIVEN GEAR *5 OIL STRAINER A

     Disassembly

    DISASSEMBLY PROCEDURE 1. REMOVE CLUTCH DRUM OIL SEAL RING (a) Remove the 4 clutch drum oil seal rings from the stator shaft assembly. 2. REMOVE OIL STRAINER ASSEMBLY (

    SEE MORE:

     Removal

    REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during brake booster assembly removal/installation are shown below. Necessary Procedures After Parts Removed/

     Cargo and luggage

    Take notice of the following information about storage precautions, cargo capacity and load: Capacity and distribution Cargo capacity depends on the total weight of the occupants. (Cargo capacity) = (Total load capacity) - (Total weight of occupants) Steps for Determining Correct Load Limit -

    © 2023-2026 Copyright www.tocamry.com