Toyota Camry (XV70): Installation
INSTALLATION
PROCEDURE
1. INSTALL TRANSMISSION OIL COOLER
| (a) Temporarily install the transmission oil cooler to the automatic transaxle case sub-assembly with the bolt (A). |
|
(b) Install the bolt (B).
Torque:
13.5 N
READ NEXT:
COMPONENTS ILLUSTRATION
*1 CLUTCH DRUM OIL SEAL RING
*2 FRONT OIL PUMP BODY
*3 FRONT OIL PUMP DRIVE GEAR
*4 FRONT OIL PUMP DRIVEN GEAR
*5 OIL STRAINER A
DISASSEMBLY PROCEDURE 1. REMOVE CLUTCH DRUM OIL SEAL RING
(a) Remove the 4 clutch drum oil seal rings from the stator shaft assembly.
2. REMOVE OIL STRAINER ASSEMBLY
(
SEE MORE:
DESCRIPTION Refer to DTC P008700. Click here
DTC No. Detection Item
DTC Detection Condition Trouble Area
MIL Memory
Note P008800
Fuel Rail / System Pressure - Too High
Although the ECM is requesting the fuel pump assembly (for high pressure side) to ope
If communication between the electronic key and vehicle is
interrupted or the electronic key cannot be used
because the battery is depleted, the smart key system and wireless
remote control cannot be used. In such cases, the doors
and trunk can be opened and the engine can be started by followin