Toyota Camry owners & service manuals

Toyota Camry (XV70): Installation

INSTALLATION

PROCEDURE

1. INSTALL VACUUM SWITCHING VALVE (for Active Control Engine Mount System)

(a) Install the vacuum switching valve (for active control engine mount system) to the front engine mounting insulator with the nut.

Torque:

6.0 N·m {61 kgf·cm, 53 in·lbf}

(b) Connect the 3 vacuum hoses to the vacuum switching valve (for active control engine mount system).

(c) Engage the wire harness clamp and connect the vacuum switching valve (for active control engine mount system) connector.

(d) Install the 2 bolts.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

(e) Engage the wire harness clamp and install the engine wire with the bolt.

Torque:

8.0 N·m {82 kgf·cm, 71 in·lbf}

2. INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE

Click here

3. INSTALL INLET AIR CLEANER ASSEMBLY

Click here

4. INSTALL COOL AIR INTAKE DUCT SEAL

Click here

    READ NEXT:

     2gr-fks (engine Mechanical)

     Camshaft

     Components

    COMPONENTS ILLUSTRATION *1 VENTILATION HOSE *2 PURGE VALVE (PURGE VSV) *3 NO. 1 FUEL VAPOR FEED HOSE *4 NO. 2 SURGE TANK STAY *5 INTAKE AIR SURGE TANK A

    SEE MORE:

     Inspection

    INSPECTION PROCEDURE 1. INSPECT BRAKE VACUUM CHECK VALVE ASSEMBLY (a) Check that there is ventilation from the booster side to the engine side, and no ventilation from the engine side to the booster side of the brake vacuum check valve assembly. If the result is not as specified, replace th

     Pcv Valve

    ComponentsCOMPONENTS ILLUSTRATION *1 PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY) *2 V-BANK COVER SUB-ASSEMBLY *3 VENTILATION HOSE - - N*m (kgf*cm, ft.*lbf): Specified torque - - RemovalREMOVAL PROCEDURE 1. REMOVE V-BANK COVER SUB-ASSEM

    © 2023-2026 Copyright www.tocamry.com