Toyota Camry owners & service manuals

Toyota Camry (XV70): Installation

INSTALLATION

PROCEDURE

1. INSTALL VACUUM SWITCHING VALVE (for Active Control Engine Mount System)

(a) Install the vacuum switching valve (for active control engine mount system) to the front engine mounting insulator with the nut.

Torque:

6.0 N·m {61 kgf·cm, 53 in·lbf}

(b) Connect the 3 vacuum hoses to the vacuum switching valve (for active control engine mount system).

(c) Engage the wire harness clamp and connect the vacuum switching valve (for active control engine mount system) connector.

(d) Install the 2 bolts.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

(e) Engage the wire harness clamp and install the engine wire with the bolt.

Torque:

8.0 N·m {82 kgf·cm, 71 in·lbf}

2. INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE

Click here

3. INSTALL INLET AIR CLEANER ASSEMBLY

Click here

4. INSTALL COOL AIR INTAKE DUCT SEAL

Click here

    READ NEXT:

     2gr-fks (engine Mechanical)

     Camshaft

     Components

    COMPONENTS ILLUSTRATION *1 VENTILATION HOSE *2 PURGE VALVE (PURGE VSV) *3 NO. 1 FUEL VAPOR FEED HOSE *4 NO. 2 SURGE TANK STAY *5 INTAKE AIR SURGE TANK A

    SEE MORE:

     Definition Of Terms

    DEFINITION OF TERMS Term Definition Monitor description Description of what the ECM monitors and how it detects malfunctions (monitoring purpose and details). Related DTCs Group of diagnostic trouble codes that are output by the ECM based on the same malfunction detection

     Reassembly

    REASSEMBLY PROCEDURE 1. INSTALL OIL PUMP ROTOR SET (a) Coat the drive rotor and driven rotor with engine oil and place them into the timing chain cover assembly with the rotor marks facing up. Check that the rotors rotate smoothly. *a Rotor Mark 2. I

    © 2023-2026 Copyright www.tocamry.com