Toyota Camry (XV70): 2gr-fks (engine Mechanical)
READ NEXT:
COMPONENTS ILLUSTRATION
*1 VENTILATION HOSE
*2 PURGE VALVE (PURGE VSV)
*3 NO. 1 FUEL VAPOR FEED HOSE
*4 NO. 2 SURGE TANK STAY
*5 INTAKE AIR SURGE TANK A
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during c
SEE MORE:
DESCRIPTION The D-4S system has two injection systems. One is an in-cylinder direct injection system that directly injects pressurized fuel into the combustion chamber. The other is an intake port injection system. The ECM determines the percentage of direct injection and port injection necessary in
REMOVAL PROCEDURE 1. REMOVE V-BANK COVER SUB-ASSEMBLY
Click here
2. REMOVE NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)
(a) Disconnect the No. 1 vacuum switching valve assembly (for ACIS) connector.
(b) Disconnect the 2 vacuum hose assemblies from the No.