Toyota Camry (XV70): Installation
INSTALLATION
PROCEDURE
1. INSTALL ENGINE OIL LEVEL SENSOR
(a) Install the engine oil level sensor to the oil pan sub-assembly with the 2 nuts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(b) Install a new clip to the engine oil level sensor.
2. INSTALL OIL STRAINER SUB-ASSEMBLY
Click here
3. INSTALL NO. 2 OIL PAN SUB-ASSEMBLY
Click here
4. REMOVE ENGINE ASSEMBLY FROM ENGINE STAND
Click here
READ NEXT:
COMPONENTS ILLUSTRATION
*1 ENGINE OIL PRESSURE SWITCH ASSEMBLY
*2 FRONT FENDER APRON SEAL RH
*3 WIRE HARNESS PROTECTOR
- -
N*m (kgf*cm, ft*lbf): Sp
REMOVAL PROCEDURE 1. REMOVE FRONT FENDER APRON SEAL RH
Click here
2. DRAIN ENGINE OIL Click here
3. REMOVE ENGINE OIL PRESSURE SWITCH ASSEMBLY
(a) Disengage the clamp to disco
SEE MORE:
COMPONENTS ILLUSTRATION
*A for Single Type
*B for Dual Type
*1 AIR CONDITIONING HARNESS ASSEMBLY
*2 COOLER EXPANSION VALVE
*3 GROMMET SUB-ASSEMBLY
*4 HEATER CLAMP
*5 HEATER PIPE GROMMET
*6 HEATER RADIATOR UNIT SUB-ASSEMBLY
*7 N
TERMINALS OF ECU CHECK MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU) AND INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
(a) Disconnect the instrument panel junction block assembly and main body ECU (multiplex network body ECU) connectors.
(b) Measure the voltage and resistance according to the value(s