Toyota Camry (XV70): Installation
INSTALLATION
PROCEDURE
1. INSTALL STARTER ASSEMBLY
(a) Install the starter assembly with the 2 bolts.
Torque:
46 N·m {469 kgf·cm, 34 ft·lbf}
(b) Connect the engine wire to the terminal 30 with the nut.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(c) Close the terminal cap.
(d) Connect the starter assembly connector.
2. INSTALL BATTERY CLAMP SUB-ASSEMBLY
Click here
3. INSTALL ECM
Click here
4. INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE
Click here
5. INSTALL INLET AIR CLEANER ASSEMBLY
Click here
6. INSTALL V-BANK COVER SUB-ASSEMBLY
Click here
7. INSTALL COOL AIR INTAKE DUCT SEAL
Click here
8. INSTALL BATTERY
Click here
READ NEXT:
COMPONENTS ILLUSTRATION
*1 AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE
*2 INLET AIR CLEANER ASSEMBLY
*3 BATTERY CLAMP SUB-ASSEMBLY
*4 COOL AIR INTAKE DUCT SEAL
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced starter a
DISASSEMBLY PROCEDURE 1. REMOVE MAGNET STARTER SWITCH ASSEMBLY
(a) Remove the nut and disconnect the field coil lead wire from the magnet starter switch assembly.
(b) Wh
SEE MORE:
DISASSEMBLY CAUTION / NOTICE / HINT
NOTICE: Before installation of each part, thoroughly clean and dry it. Then apply gear oil to it. Do not use alkaline chemicals to clean aluminum parts, rubber parts or ring gear set bolts. Also, do not use non-residue solvent or other cleaning oils to clean O-r
SYSTEM DIAGRAM
*1 Purge Valve (Purge VSV)
*2 Fuel Tank Cap Assembly
*3 Fuel Tank Assembly
*4 Canister Filter
*5 Fuel Cut-off Valve
*6 ECM
*7 Canister Pump Module (Charcoal Canister Leak Detection Pump Sub-assembly)
*8 Pump Mot