Toyota Camry owners & service manuals

Toyota Camry (XV70): On-vehicle Inspection

ON-VEHICLE INSPECTION

PROCEDURE

1. FUEL PUMP ASSEMBLY OPERATION

(a) Check fuel pressure.

(1) Connect the Techstream to the DLC3.

(2) Start the engine.

(3) Turn the Techstream on.

(4) Enter the following menus: Powertrain / Engine / Active Test / Control the Target Fuel Pressure Offset.

Powertrain > Engine > Active Test

Active Test Display

Control the Target Fuel Pressure Offset

Data List Display

Fuel Pressure (High)

(5) Select the Data List item: Fuel Pressure (High)

(6) Check that the fuel pressure fluctuates when the target fuel pressure changes.

HINT:

The target fuel pressure operation decreases the target fuel pressure by 12.5% or increases the target fuel pressure by 24.8%.

If the result is not as specified, replace the fuel pump assembly or fuel pressure sensor (fuel delivery pipe with sensor assembly LH).

(b) Check operating sound.

(1) Remove the cowl top ventilator louver sub-assembly.

Click here

(2) Remove the front center upper suspension brace sub-assembly.

Click here

(3) Start the engine.

(4) Using a sound scope, check the operating sound of the fuel pump assembly.

If no sound can be heard, check the fuel pump assembly, wire harness and ECM.

(5) Stop the engine.

(6) Install the front center upper suspension brace sub-assembly.

Click here

(7) Install the cowl top ventilator louver sub-assembly.

Click here

    READ NEXT:

     Removal

    REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during fu

     Inspection

    INSPECTION PROCEDURE 1. INSPECT FUEL PUMP ASSEMBLY (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Sp

     Installation

    INSTALLATION PROCEDURE 1. TEMPORARILY INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY (a) Turn the crankshaft pulley until the flat of the camshaft faces the fuel pump lifter assembly. HINT: Th

    SEE MORE:

     Installation

    INSTALLATION PROCEDURE 1. INSTALL ENGINE COVER BRACKET (a) Install the engine cover bracket to the cylinder head cover sub-assembly LH with the bolt. Torque: 10 N·m {102 kgf·cm, 7 ft·lbf} 2. INSTALL WATER FILLER BRACKET (a) Temporarily install the water filler bracket to the camshaft h

     System Description

    SYSTEM DESCRIPTION HEATED STEERING WHEEL SYSTEM (a) The steering heater warms up the steering wheel when the steering heater switch is turned on. (b) The steering heater uses a control thermostat inside the steering wheel to maintain the steering wheel at the specified temperature. OPERATIO

    © 2023-2025 Copyright www.tocamry.com