Toyota Camry (XV70): Inspection
INSPECTION
PROCEDURE
1. INSPECT FLOW SHUTTING VALVE (NO. 1 WATER BY-PASS HOSE)
| (a) Measure the resistance according to the value(s) in the table below.
Standard Resistance: |
Tester Connection | Condition |
Specified Condition | |
1 - 2 | 20°C (68°F) |
22 to 28 Ω | If the result is not as specified, replace the flow shutting valve (No. 1 water by-pass hose). |
|
|
*a | Component without harness connected
(Flow Shutting Valve (No. 1 Water By-pass Hose)) | | |
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL FLOW SHUTTING VALVE (NO. 1 WATER BY-PASS HOSE)
(a) Install the flow shutting valve (No. 1 water by-pass hose) with the bolt.
Torque: 19 N·m {194 kgf·cm, 14 ftÂ
COMPONENTS ILLUSTRATION
*1 FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY)
*2 VACUUM HOSE
*3 ENGINE WIRE HARNESS
*4 OUTLET HEATER HOSE
*5 INLET HEATER
SEE MORE:
DESCRIPTION The park/neutral position switch assembly detects the shift lever position and sends signals to the ECM.
DTC No. Detection Item
DTC Detection Condition Trouble Area
MIL Memory
Note P070513
Transmission Range Sensor "A" Circuit Open
When the engi
InspectionINSPECTION PROCEDURE
1. INSPECT ST RELAY (a) Check the resistance.
(1) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection Condition
Specified Condition
3 - 5 Battery voltage not applied to termin