Toyota Camry (XV70): Inspection
INSPECTION
PROCEDURE
1. INSPECT FLOW SHUTTING VALVE (NO. 1 WATER BY-PASS HOSE)
| (a) Measure the resistance according to the value(s) in the table below.
Standard Resistance: |
Tester Connection | Condition |
Specified Condition | |
1 - 2 | 20°C (68°F) |
22 to 28 Ω | If the result is not as specified, replace the flow shutting valve (No. 1 water by-pass hose). |
|
|
*a | Component without harness connected
(Flow Shutting Valve (No. 1 Water By-pass Hose)) | | |
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL FLOW SHUTTING VALVE (NO. 1 WATER BY-PASS HOSE)
(a) Install the flow shutting valve (No. 1 water by-pass hose) with the bolt.
Torque: 19 N·m {194 kgf·cm, 14 ftÂ
COMPONENTS ILLUSTRATION
*1 FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY)
*2 VACUUM HOSE
*3 ENGINE WIRE HARNESS
*4 OUTLET HEATER HOSE
*5 INLET HEATER
SEE MORE:
INSPECTION PROCEDURE 1. INSPECT ENGINE SWITCH
(a) Check the resistance.
(1) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection Condition
Specified Condition
5 (SS1) - 6 (AGND) 1 (SS2) - 6 (AGND)
Not p
INSPECTION PROCEDURE 1. INSPECT FUEL SENDER GAUGE ASSEMBLY
CAUTION: Perform the inspection in a well-ventilated area. Do not perform the inspection near an open flame.
(a) Check that the float moves smoothly between F and E. (b) Check the fuel sender gauge assembly voltage.
(1) Apply 5 V b