Toyota Camry (XV70): Installation
INSTALLATION
PROCEDURE
1. INSTALL TIMING CHAIN CASE OIL SEAL
| (a) Apply MP grease to the lip of a new timing chain case oil seal. |
|
|
*a | Oil Seal Protrusion Height | | |
(b) Using SST and a hammer, tap in the timing chain case oil seal until its surface is flush with the timing chain cover assembly edge.
SST: 09316-60011
09316-00011
Oil Seal Protrusion Height:
0 to 1.0 mm (0 to 0.0394 in.)
NOTICE:
- Keep the lip free from foreign matter.
- Do not tap in the timing chain case oil seal at an angle.
2. INSTALL CRANKSHAFT PULLEY
(a) Align the pulley set key with the key groove of the crankshaft pulley.
(b) Using SST to hold the crankshaft pulley in place, tighten the crankshaft pulley set bolt.
|
*a | Hold |
|
Turn |
SST: 09213-70011
09213-70020
SST: 09330-00021
Torque:
260 N·m {2651 kgf·cm, 192 ft·lbf}
3. INSTALL V-RIBBED BELT
Click here
4. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE
Click here
READ NEXT:
COMPONENTS ILLUSTRATION
*1 REAR ENGINE OIL SEAL
*2 NO. 1 CRANKSHAFT POSITION SENSOR PLATE
*3 DRIVE PLATE AND RING GEAR SUB-ASSEMBLY
*4 REAR DRIVE PLATE SPACER
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during r
SEE MORE:
DESCRIPTION The high-pressure direct injection fuel system consists of a spill control valve, check valve, fuel relief valve, fuel pressure sensor, fuel pump assembly (for high pressure side) and fuel injector assemblies (for direct injection). The spill control valve adjusts the return volume of hi
On-vehicle InspectionON-VEHICLE INSPECTION PROCEDURE
1. INSPECT NO. 1 ELECTRONIC FUEL INJECTION MAIN RELAY (EFI-MAIN NO. 1)
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection Condition
Specified Condition