Toyota Camry (XV70): Installation
INSTALLATION
PROCEDURE
1. INSTALL STARTER ASSEMBLY
(a) Install the starter assembly with the 2 bolts.
Torque:
46 N·m {469 kgf·cm, 34 ft·lbf}
(b) Connect the engine wire to the terminal 30 with the nut.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(c) Close the terminal cap.
(d) Connect the starter assembly connector.
2. INSTALL BATTERY CLAMP SUB-ASSEMBLY
Click here
3. INSTALL ECM
Click here
4. INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE
Click here
5. INSTALL INLET AIR CLEANER ASSEMBLY
Click here
6. INSTALL V-BANK COVER SUB-ASSEMBLY
Click here
7. INSTALL COOL AIR INTAKE DUCT SEAL
Click here
8. INSTALL BATTERY
Click here
READ NEXT:
Parts LocationPARTS LOCATION ILLUSTRATION
*1 STARTER ASSEMBLY
*2 ECM
*3 ENGINE ROOM RELAY BLOCK AND JUNCTION BLOCK ASSEMBLY
- ST RELAY - FL MAIN FUSE - ST FUSE
ComponentsCOMPONENTS ILLUSTRATION
*1 RADIATOR CAP SUB-ASSEMBLY
*2 RADIATOR DRAIN COCK PLUG
*3 NO. 1 ENGINE UNDER COVER
- - ReplacementREPLACEMENT CAUTION / NOT
SEE MORE:
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during vacuum warning switch assembly removal/installation are shown below. Necessary Procedures After Parts
COMPONENTS ILLUSTRATION
*1 REAR ARMREST ASSEMBLY
*2 REAR DOOR ARMREST COVER SUB-ASSEMBLY
*3 REAR DOOR INNER GLASS WEATHERSTRIP
*4 REAR DOOR INSIDE HANDLE SUB-ASSEMBLY
*5 REAR DOOR NO. 2 SERVICE HOLE COVER
*6 REAR DOOR TRIM BOARD SUB-ASS