Toyota Camry (XV70): Installation
INSTALLATION
PROCEDURE
1. INSPECT AND ADJUST BRAKE BOOSTER PUSH ROD
Click here
2. INSTALL BRAKE MASTER CYLINDER O-RING
(a) Install a new brake master cylinder O-ring to the brake master cylinder sub-assembly.
3. INSTALL BRAKE MASTER CYLINDER SUB-ASSEMBLY
NOTICE:
When installing a new brake master cylinder sub-assembly, remove the protectors from the master cylinder piston and outlet ports.
(a) Install the brake master cylinder sub-assembly to the brake booster assembly with the 2 nuts.
Torque:
12.5 N
READ NEXT:
COMPONENTS ILLUSTRATION
*1 BRAKE LINE
*2 BRAKE MASTER CYLINDER SUB-ASSEMBLY
Tightening torque for "Major areas involving basic vehicle performance such as moving/tur
REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during br
SEE MORE:
DESCRIPTION When the AUTO function is set to ON/OFF, a message is displayed on the multi-information display in the combination meter assembly. WIRING DIAGRAM
PROCEDURE
1.
CHECK OPERATION OF AUTO FUNCTION (a) Check that the AUTO function operates when the operating conditions are me
DISASSEMBLY PROCEDURE 1. REMOVE END COVER
(a) To prevent the coupling of the vacuum pump assembly from contacting the workbench, support the vacuum pump assembly with wooden blocks or an equivalent object.
*a Wooden Block
(b) Using a T30 "TORX" socke