REMOVAL CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during flow shutting valve (water by-pass hose assembly) removal/installation are shown below. Necessary Proc
INSPECTION PROCEDURE 1. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
NOTICE: Both the park/neutral position switch assembly and transmission control shaft lever are available in two different shapes due to design changes. As they are not compatible with each other, when replacing the park/neutral