SEE MORE:
INSTALLATION PROCEDURE 1. INSTALL STUD BOLT
HINT: If a stud bolt is deformed or the threads are damaged, replace it.
(a) Using an E6 "TORX" socket wrench, install the 2 stud bolts to the intake manifold.
Torque: 10 N·m {102 kgf·cm, 7 ft·lbf}
2. INSTALL NO. 1 INTAKE M
The USB charging ports are used to supply 2.5 A (USB Type-A port)
or 3.0 A (USB Type-C port) of electricity at 5 V to external devices.
The USB charging ports are for charging only. They are not designed
for data transfer or other purposes.
Depending on the external device, it may not charge