SEE MORE:
DESCRIPTION The ECM constantly generates a 5 V power source voltage from the battery voltage supplied to the +B, +B2 (BATT) terminals to operate the microprocessor. The ECM also provides this power to the sensors through the VC output circuit.
When the VC circuit has a short circuit, the micropro
INSTALLATION PROCEDURE 1. INSTALL AUTOMATIC LIGHT CONTROL SENSOR
(a) Engage the 2 claws to install the automatic light control sensor. (b) Connect the connector.
2. INSTALL DEFROSTER NOZZLE ASSEMBLY Click here
3. INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT Click here
4. INSTALL NO. 1