INSTALLATION PROCEDURE 1. INSTALL FLOW SHUTTING VALVE (NO. 1 WATER BY-PASS HOSE)
(a) Install the flow shutting valve (No. 1 water by-pass hose) with the bolt.
Torque: 19 N·m {194 kgf·cm, 14 ft·lbf} (b) Connect the flow shutting valve connector.
(c) Connect the flow shutting valve (No. 1 wa
DISPOSAL PROCEDURE 1. DISPOSE OF LUGGAGE COMPARTMENT DOOR SUPPORT ASSEMBLY
(a) Secure the luggage compartment door support assembly horizontally in a vise with the piston rod pulled out.
(b) Wearing safety glasses, gradually cut a part within the area (a) shown in the